Pump House of a Thermal Power Plant in Santa Fe Micropile retaining wall and anti heaving micropiles
In the province of Santa Fe, Ischebeck Sudamérica S.A. completed a technically demanding project that delivers a significant impact within the existing [...]
How TITAN Micropiles Hold Uplift in Their Grip The proven foundation for resisting uplift in even the toughest soil conditions.
Uplift forces can compromise the integrity of foundations if not properly addressed. TITAN Micropiles are engineered with a high bond capacity between steel and grout[...]
Efficient. Digital. Sustainable. ISCHEBECK TITAN at bauma 2025
A lot has happened at ISCHEBECK. At bauma 2025, we demonstrated how recent developments in efficiency, digitalisation and sustainability [...]
Who is TITANIA? Let us introduce her
Our impressive sculpture, TITANIA, is far more than just an eye-catcher – she embodies the values and identity of ISCHEBECK. Her story began [...]
The Rahmede Valley Bridge of the A45 Temporary excavation support with TITAN micropiles
The Rahmede Valley Bridge along the A45 motorway, completed in 1968, spanned the Rahmede Valley and State Road 530, north of Lüdenscheid, Germany. In December [...]
NEW: Eye Bolt TITAN Safely transfer tension loads up to 1390 kN
The new Eye Bolts for TITAN Micropiles can be used for any type of tie or guy ‒ in both temporary and permanent applications. They are [...]
NEW: Quickset Roofbolt TITAN 26/15 The efficient one-step stabilisation method for mines and tunnels
The STUVA Conference is a not-to-be-missed event for all national and international tunnelling experts. Ischebeck, too, will be there in [...]